Meilensteine Schiffe


     Mounting of first block in building dock, 35

     Start of prefabricated cabine, 41

    Docking the float part, 8

     Bring in of main components, 9

    Mounting of main engines, 9

     Mounting of front main switchboard, 10

    Mounting of rear main switchboard, 10

     Mounting of converterroom, 10

     Mounting of aftship (block a), 11

     Mounting of funnel (block b), 17

     Finish of Antifouling preservation, 20

    Floating up of vessel, 27

    Start shaft / el. prop. engine alignment, 28

    Check of diesel safety system, 29

    Commisioning of diesel system, 29

    Test of diesel system, 30

    End of prefabricated cabins, 32

    Test of diesel engines and Generators, 33

    Commissioning of el. propulsion plant, 35

    Test of automation and power management, 37

    Vessel in dry conditions, 41

      Dismount. br. wheel / mount. orig. Prop. 42

      Installation of Anchor chains, 42

      Floating up of vessel, 43

      System Prov. Davits (Bb.), 43

      Inclining experiment, 43

      Docking out of vessel, 43

      Mounting of mast (block d), 43

      System Prov. Davits (Stb.), 44

      Internal Black out test, 44

      Conveyance of vessel, 45

      Sea trail, 46

      Delivery of vessel, 49